Skip to content
Opaa Facility Management Group

Post-construction cleaning in Chicago

A finished build-out is not ready for people until the dust is out of it. Our post-construction cleaning in Chicago is for general contractors and building owners, from the rough clean while trades finish to the final clean before move-in.

Empty office floor with new carpet tile and ceiling lights, ready for tenants
Photo: Orderinchaos, CC BY-SA 3.0

Who post-construction cleaning is for

General contractors who need a space handed over clean. Building owners and property managers turning a suite around for a new tenant. Businesses moving into a space that was just built out for them. Each of them has a date when people walk in, and fine dust that keeps coming out of the corners for days after the trades leave.

Post-construction cleaning in Chicago is the step between the end of the work and that date.

Rough clean, final clean and touch-up

Most projects are cleaned in three passes.

Pass When What it covers
Rough clean After the heavy work, while finishes are going in Loose debris, packaging and dust on floors and surfaces, so trades can finish in a clean space
Final clean After the punch list, before move-in Every surface top to bottom, glass, fixtures, cabinets inside and out, floors cleaned for their finish
Touch-up After the last trade visit, right before people arrive Dust and marks left by late fixes, deliveries and furniture installers

A small suite may only need the final clean and a touch-up. A full floor or a new building usually needs all three.

What the final clean includes

  • Dust removed from every surface, high to low: ledges, door frames, light fixtures and the faces of vents and diffusers
  • Interior glass, window sills and frames, and the tracks of sliding doors
  • Labels, stickers and protective film taken off fixtures, glass and appliances
  • Restrooms and kitchens cleaned and fixtures polished, inside cabinets and drawers too
  • Hard floors cleaned for their surface, with finish on vinyl tile where the floor needs it, through our floor care
  • Carpet vacuumed thoroughly, with carpet cleaning where construction dust has worked into it

What stays with the contractor

Bulk construction debris, leftover materials, the dumpster and anything hazardous stay with the contractor and the trades. Paint overspray, adhesive on finished surfaces and damage are punch list items, not cleaning. Tell us at the site assessment what will be left in the space so the proposal covers the right work.

Booking around the punch list

Cleaning too early is the most common problem. If the final clean happens before the last trades are finished, their dust ends up on surfaces that were already done, and the space has to be cleaned again. Book the final clean for after the punch list is closed, and keep a touch-up in the plan for the day before move-in.

Downtown, plan for the building as well as the suite. Many Chicago Loop towers ask every vendor for a certificate of insurance and a booked freight elevator before the crew can start, and those take time to arrange.

After move-in

Once the space is open, it needs regular cleaning. The same building can move straight onto janitorial service or office cleaning with us, and the regular schedule starts from a space we already know.

To plan the cleaning for your project, book a site assessment or call (847) 692-1873.

Questions about post-construction cleaning

When should post-construction cleaning be scheduled?

Book the rough clean for when the noisy work is done and the final clean for after the punch list is closed, a few days before move-in. Leave time for a touch-up after the last trade visit.

Do you haul away construction debris?

Bulk debris, leftover materials and the dumpster stay with the contractor. We remove the dust and small debris that is left after that, along with packaging, labels and film.

Can you clean while trades are still on site?

The rough clean can happen while finish work is still going on in other areas. The final clean is best done once the trades are out, so dust from their work does not settle on surfaces that were already cleaned.

Do you clean after a build-out in an occupied building?

Yes. A suite build-out in a building that stays open needs the same care for the shared corridors and elevators the crews used, often at night so tenants are not disturbed.

How much does post-construction cleaning cost in Chicago?

Every project is different, so we do not publish prices. We walk the space with you at a site assessment and send you a proposal for the job.

Book your site assessment

We come to your building and look at it with you, so the proposal you get fits the space and the problems you actually have.

Prefer to talk first?

Call (847) 692-1873

Opaa Facility Management Group
11 N Northwest Hwy, Suite 186, Park Ridge, IL 60068